Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("Champ Erskine")

Results 1 to 7 of 7

  • Page / 1
Export

Selection :

  • and

Erskine pace hots upBRADBURY, J.Euroil. 1997, Vol 08, Num 04, issn 0802-9474, p. 22Article

La canalisation d'exportation à isolation thermique du champ d'Erskine = The thermally isolated exportation pipeline of the Erskine fieldBORELLI, A; JUDD, S.Séminaire annuel COPREP-CEPM 1996. 1996, 7 p.Conference Paper

Pressure measurement during HP/HT drillingJournal of petroleum technology. 1998, Vol 50, Num 6, pp 77-78, issn 0149-2136Article

Clamp separator clips Erskine shutdown timeNOBLE, Robert.Offshore engineer. 2003, Num OCT, pp 41-42, issn 0305-876X, 2 p.Article

Erskine field HPHT workover and tubina corrosion failure investigationMOWAT, D. E; EDGERTON, M. C; WADE, E. H. R et al.SPE / IADC drilling conference. 2001, vol 2, 229-237Conference Paper

Measurement of hydrostatic and hydraulic pressure changes during HPHT drilling on Erskine fieldSWANSON, B. W; ELLIOTT, G. S; MEIER, J. L et al.Offshore Europe 97. Conference. 1997, pp 169-181Conference Paper

Still early days for HPHT : North seaQUINLAN, Martin.Petroleum economist (English edition). 2001, Vol 68, Num 8, pp 31-32, issn 0306-395XArticle

  • Page / 1